Step
4
Enter the SHOW RUNNING-CONFIG command to display the running configuration
of the master switch:
awplus# show running-config
Use the display to confirm that you designated the correct trunk ports for the master
and member switches. The ports should be designated with INTERFACE PORT and
STACKPORT commands. In the following example, the stack trunk will consist of
ports 1 to 4 on the line cards in slot 4 on the master (port1) and member switches:
interface port1.4.1-1.4.4
stackport
.
interface port2.4.1-2.4.4
stackport
.
interface port3.4.1-3.4.4
stackport
.
interface port4.4.1-4.4.4
stackport
Go to "What to Do Next" on page 165.
5

What to Do Next

Table 21. Verifying the Master Switch (Continued)
Description and Command
After configuring the master switch, do the following:
1. Power off the switch, as follows:
For AC power supplies, disconnect the AC power cords from the
AC power sources.
For SBxPWRSYS1-80 DC Power Supplies, power off the On/Off
switch on the power supplies. Refer to Figure 67 on page 121.
2. Configure the member switches. Refer to "Configuring Member
Switches" on page 166.
3. After configuring the master and member switches, cable the ports of
the stack trunk. Refer to Chapter 7, "Cabling XEM2 Line Card Ports"
on page 177.
4. Power on the master and member switches of the stack. Refer to
"Powering on the Stack" on page 174.
5. Verify the stack by referring to "Verifying the Stack" on page 175.
6. Cable the networking ports. Refer to Chapter 7, "Cabling XEM2 Line
Card Ports" on page 177.
SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
165

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents