Figure 120: Lifting The Locking Handle And Removing The Power Supply - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Figure 120. Lifting the Locking Handle and Removing the Power Supply
12. Do one of the following:
To install a new power supply, refer to "Installing SBxPWRSYS2
AC Power Supplies" on page 101 or "Installing SBxPWRSYS1-80
DC Power Supplies" on page 105.
If you are not installing a new power supply, continue with this
procedure to install the blank power supply slot cover.
13. Place the locking handle on the blank power supply slot cover in the up
position and slide the cover into the empty power supply slot. Refer to
Figure 121 on page 200.
SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
199

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents