Figure 81: Opening The Plastic Cover - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

3. Verify that the On/Off switch on SBxPWRSYS1-80 Power Supply is in
the Off position. Refer to Figure 71 on page 124.
4. Use a #1 Phillips-head screwdriver to loosen the two screws on the
plastic cover over the positive and negative terminals on the power
supply and slide the cover to the right, as shown in Figure 81 on page
133. You may need to lift the locking handle slightly to access the
bottom screw.
Figure 81. Opening the Plastic Cover
5. Use a #3 Phillips-head screwdriver to remove the two screws from the
positive and negative terminals, as shown in Figure 82 on page 134.
SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
133

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents