Figure 85: Closing The Plastic Cover Over The Terminal Connectors - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
Figure 85. Closing the Plastic Cover over the Terminal Connectors
9. With a #2 Phillips-head screwdriver, tighten the handle locking screw
to secure the power supply to the chassis. See Figure 86 on page 138.
137

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents