Chapter 4: Installing The Chassis - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Advanced layer 3+ modular switch alliedware plus v5.4.9-2, virtual chassis stacking
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Chapter 4
Installing the Chassis
The procedures in this chapter explain how to install the chassis in a
standard 19-inch equipment rack. The procedures are listed here:
"Tools and Material" on page 92
"Adjusting the Equipment Rack Brackets" on page 93
"Installing the Chassis in an Equipment Rack" on page 97
"Installing the Chassis Grounding Wire" on page 98
"Installing SBxPWRSYS2 AC Power Supplies" on page 101
"Installing SBxPWRSYS1-80 DC Power Supplies" on page 105
"Installing Ethernet Line Cards" on page 109
"Installing Blank Line Card Slot Covers" on page 113
"Installing the Blank Power Supply Slot Cover" on page 115
"Installing the Power Cord Retaining Clips" on page 117
"Verifying the Installation" on page 118
91

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbx908 gen2

Table of Contents