– Installation of electricity meter which divides remote control groups is prohibited.
Whm
– Installation of electricity meter which crosses the contract is prohibited.
When an electricity meter is used by electricity charge apportionment function, install the elec-
tricity meter so that it does not cross over the "contract setting" set by electricity charge appor-
tionment.
2-26. Electricity charge apportionment setting (System controller, Touch panel
controller)
Whm
Whm
Remote controller group
Whm
Whm
Whm
Whm
Whm
Whm
Whm
Whm
Whm
Whm
Whm
- (07-146) -
Whm
Whm
Whm
Remote controller group
Whm
Whm
Whm
Whm
Contract 1
Contract 2
Contract 3
Contract 1
Contract 2
Contract 3
2. Function settings