Dräger Cicero EM Instructions For Use Manual page 187

Integrated anaesthetic workstation
Table of Contents

Advertisement

1 Both green LEDs on the touch-sensitive keypads on
the Cicero EM mounting arm and on the DVE light up
when correctly positioned.
The DVE can now be controlled via the keypad on
the Cicero EM!
2 Press key until Cicero EM reaches the required
working height.
When Cicero EM has been raised approx. 5 cm, the
keypad on the DVE also becomes active in parallel
to that on the Cicero EM mounting arm. Operation
can then be continued from there.
3 Press key to release bearings.
The DVE can be pivoted into the required position.
Single-arm DVE units:
Upper key for ceiling bearing
Lower key for end bearing
Two-armed DVE units with extension arm:
Upper key for ceiling and end bearings
Lower key for intermediate bearing
Disconnecting the Cicero EM ceiling version
Any obstacles in Cicero EM's path as it descends
will be subject to Cicero EM's full weight (approx.
150 kg) and may be crushed.
Before lowering Cicero EM, always ensure that
there is nothing to prevent it from being deposited
directly on the floor!
4 Press key until lower limit stop is reached.
Disconnect mains plug and gas supply lines of the
Cicero EM.
1
2
3
4
Description
Operation of the ceiling version
187

Advertisement

Table of Contents
loading

Table of Contents