Rack Mounting; Panel Mounting - adept technology MV User Manual

Hide thumbs Also See for MV:
Table of Contents

Advertisement

Chapter 3

Rack Mounting

To rack mount the Adept MV-5 or MV-10 robot controller in a standard 19-inch
equipment rack, you must first install the mounting brackets (see
then build an extender panel and attach it to the bracket on one side of the
controller.
The controller can be joined to an Adept PA-4 power chassis and mounted in a
rack. Refer to the robot instruction handbook that comes with the robot for
information.

Panel Mounting

To panel mount the Adept MV-5 or MV-10 robot controller, install one bracket on
each side near the back of the controller. Use the screws and washers from the
accessories kit; see
70
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Installing a Robot Controller in a Rack or Panel
Figure
3-9.
Adept MV Controller User's Guide, Rev. B
Figure
3-9),

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mv-5Mv-10Mv-4

Table of Contents