Plant Installation, Inspection, And Testing; System Overview - ProMinent DULCOMETER PH-501 Assembly And Operating Instructions Manual

Compact controller
Table of Contents

Advertisement

4.0

PLANT INSTALLATION, INSPECTION, AND TESTING

4.1

System Overview

The newterra MicroClear
Nunavut. The system consists of five (5) modified 40 foot High Cube ISO shipping containers
and one (1) modified 53 foot High Cube ISO shipping container. See below. .
newterra O&M Manual
© 2017 by newterra, ltd.
All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical,
photocopying, recording, or otherwise, without prior written permission of newterra ltd.
TM
MBR WWTP is 96m3/day MBR for for the Amaruq Mine located in
1291 California Avenue, Brockville, ON K6V 5W3
(800) 420-4056 / www.newterra.com
newterra ltd.
28

Advertisement

Table of Contents
loading

This manual is also suitable for:

986214

Table of Contents