Installation
The pump-motor unit is ready to connect on
delivery.
However, if the time from delivery to
commissioning of the pump-motor unit exceeds a
certain period, the lubrication of the rolling
bearings must be renewed.
See Chapter 8.2, "Storage conditions",
Section "Lubrication of rolling bearings after
longer storage", Pg. 23 for information on this
topic.
Carry out the following work to install the pump-
motor unit:
Installation and securing,
Attachment of the included loose muffler if
necessary,
Attachment of threaded flange or hose flange
(available as accessories)
for the connection of inlet or discharge pipe to
the muffler,
Electrical connection,
Connection of inlet and discharge connection
to the system.
5.1
Installation
610.44436.40.000
14 / 28