Commissioning and Start-up

newterra MicroClear
TM
project execution process.
As part of your order, the following on site services will be provided by experienced factory trained
newterra representative:
Includes five (5) 8-hour days of onsite startup/commissioning by one (1) factory trained
newterra representative
Includes five (5) 8-hour days of onsite training by one (1) factory trained newterra
representative

9.1.1 Startup/Commissioning

Typical System Startup/Commissioning includes the following:
Equipment checks - Electrical, mechanical, and controls
Functional test - Equipment and control system
Hydraulic test
Operation during plant seeding

9.1.2 Training

On-site operator training including the following topics:
General MBR theory & process
Specific system instruction
o Components
o Controls and operating philosophy
o Alarms and alarm troubleshooting
o Maintenance
o Troubleshooting
o MBR fouling control (Biology, physical, and chemical)
newterra O&M Manual
© 2017 by newterra, ltd.
All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical,
photocopying, recording, or otherwise, without prior written permission of newterra ltd.
MBR System's commissioning & start-up is the last step of the newterra
1291 California Avenue, Brockville, ON K6V 5W3
(800) 420-4056 / www.newterra.com
newterra ltd.
146

Advertisement

Table of Contents
loading

This manual is also suitable for:

986214

Table of Contents