7.3.1.1 Procedure – Backwash Solution Preparation
Note: It is recommended that only one membrane module at a time be cleaned
(backwash).
Prepare the backwash solution as follows:
1) If backwash tank TNK-801 is empty:
a. Ensure membrane is enabled and pulling, and turn SV-801 solenoid valves on
hand ("H") until backwash tank is filled with required volume for chemical
backwash (3L per cassette X 20 cassettes per module = 60 L OR approx. 1/4
capacity of TNK-801). Note TNK-801 capacity is 272L.
b. Turn SV-801 series solenoid valves off ("O")
c. Skip to step 3
newterra O&M Manual
© 2017 by newterra, ltd.
All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical,
photocopying, recording, or otherwise, without prior written permission of newterra ltd.
1291 California Avenue, Brockville, ON K6V 5W3
(800) 420-4056 / www.newterra.com
newterra ltd.
98