Site Conditions Requirements; Inspection Upon Delivery - ProMinent DULCOMETER PH-501 Assembly And Operating Instructions Manual

Compact controller
Table of Contents

Advertisement

4.2

Site Conditions Requirements

Installation site for the newterra MicroClear
drain and have a sufficient power source (refer to Electrical Drawings in Appendices B-
F).
Location must permit easy access for equipment capable of transporting, offloading, and
handling of the designed loads.
There should be adequate space around the containers for safe operation and
maintenance.
The firm base (foundation) must be built to support the full operating weight of the plant
to prevent buildings from shifting and pipe/electrical conduit connection failure – pilings
are recommended.
WARNING:
water lines, electrical and telephone cables, or any additional hazards below
grade, prior to excavation. Failure to do so could result in severe bodily injury or
death.
4.3

Inspection upon Delivery

The newterra MicroClear
manufacturing plant. All equipment is pre-wired, pre-piped, mounted inside the enclosures and
factory tested. Upon receiving the system, please perform the following:
Place the container onto the prepared firm base to avoid sagging, equipment vibration,
and shifting. When lifting the containers, ensure that lifting equipment is clear of
overhead obstructions such as power lines, trees or rooftops. Be careful during this
procedure!
Be careful when offloading the containers to prevent damage to the internal pipe work.
Check the containers for any signs of shipping damages.
newterra O&M Manual
© 2017 by newterra, ltd.
All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical,
photocopying, recording, or otherwise, without prior written permission of newterra ltd.
The firm base for the container must be level and
must be capable of supporting the operating
weight.
Always check with the local utility companies for the location of
TM
MBR WWTP is carefully manufactured, checked, and tested at the
1291 California Avenue, Brockville, ON K6V 5W3
TM
MBR WWTP should be close to the sewer
newterra ltd.
(800) 420-4056 / www.newterra.com
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

986214

Table of Contents