WAGO 750-495/040-00 Series Manual page 45

3-phase power measurement module 690 v for wago-i/o-system 750 xtr
Table of Contents

Advertisement

WAGO-I/O-SYSTEM 750 XTR
750-495/040-00x 3-Phase Power Measurement Module 690 V
Table 25: Measured Values
Measured Value
Peak value, current, L2
Peak value, current, L3
RMS current, N
Power
effective power, L1
Effective power, L2
Effective power, L3
Maximum effective power, L1
Maximum effective power, L2
Maximum effective power, L3
Minimum effective power, L1
Minimum effective power, L2
Minimum effective power, L3
Reactive power, L1
Reactive power, L2
Reactive power, L3
Apparent power, L1
Apparent power, L2
Apparent power, L3
Energy
Active energy, L1
Active energy, L2
Active energy, L3
Active energy import, L1
Active energy import, L2
Active energy import, L3
Active energy export, L1
Active energy export, L2
3)
Although measured values are output for the effective power of L1 and effective power of L3, as well
as reactive power of L1 and reactive power of L3, they have no metrological meaning taken
individually. To determine the total effective power, it is necessary to sum the measured values for
the effective power of L1 and effective power of L3, and to determine the total reactive power, it is
necessary to sum the measured values for reactive power of L1 and reactive power of L3.
4)
The I/O module uses the 3-wattmeter method for measurement. On the basis of this measurement
method, the I/O module always determines the measured quantities for an equivalent wye load,
regardless of the load type of the wiring (wye or delta load). The measured values of the individual
phases are correct for a symmetrical wye load. For an asymmetrical wye load, or for a symmetrical
or asymmetrical delta load, the individual measured values of a phase have no significance on their
own. In these cases, only the total power values are correct. The total power values must be
calculated outside the I/O module (e.g., P
3-Wire
4-Wire
Wye/
Wye
Delta
X
X
X
X
X
X
-
X
X
-
X
X
X
X
X
X
X
-
X
X
-
X
X
X
X
X
X
X
X
X
X
X
= P1 + P2 + P3).
total
Function Description
4-Wire
Wye,
Star Point
2-Phase
X
X
-
X
3)
X
-
X
3)
X
-
X
-
X
-
X
-
X
-
X
-
X
3)
X
-
X
3)
X
-
X
-
X
-
X
-
X
-
X
-
X
-
X
-
X
-
X
-
X
-
X
Version 1.2.0
45
Artificial
X
X
-
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
4)
X
Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

750-495/040-000750-495/040-001750-495/040-002

Table of Contents