WAGO-I/O-SYSTEM 750 XTR
750-495/040-00x 3-Phase Power Measurement Module 690 V
Table 63: CSV File "Snapshot" (Example of 4-Wire Wye)
I/O-Check 3-Phase Power Measurement (750-495/040-000)
Errors/warnings
Parameters Phase L1
Overvoltage limit
Overcurrent limit
Interval observation:
arithm. mean calculation
Interval observation: peak value
measurement
Take current transformer ratio into
account
Automatic reset of the min./max. values
Current transformer ratio
Undervoltage limit
Interval – reset: min./max. values
Parameters Phase L2
Overvoltage limit
Overcurrent limit
Interval observation:
arithm. mean calculation
Interval observation: peak value
measurement
Take current transformer ratio into
account
Automatic reset of the min./max. values
Current transformer ratio
Undervoltage limit
Interval – reset: min./max. values
Parameters Phase L3
Overvoltage limit
Overcurrent limit
Interval observation:
arithm. mean calculation
Interval observation: peak value
measurement
Take current transformer ratio into
account
Automatic reset of the min./max. values
Current transformer ratio
Undervoltage limit
Interval – reset: min./max. values
410 V
5000000 A
60 s
10 half-waves
False
False
500
10 V
2000 ms
410 V
5000000 A
60 s
10 half-waves
False
False
700
10 V
2000 ms
410 V
5000000 A
60 s
10 half-waves
False
False
200
10 V
2000 ms
Appendix 283
Manual
Version 1.2.0