Checklists For Installation Technicians; Install And Cable Cabinet Checklist - Avaya DEFINITY ONE Installation And Upgrades

Internet protocol communications server
Hide thumbs Also See for DEFINITY ONE:
Table of Contents

Advertisement

Installation and Upgrades for DEFINITY ONE and
IP600 Internet Protocol Release 10 555-233-109
Checklists

Checklists for Installation Technicians

Checklists
Checklists for Installation Technicians

Install and Cable Cabinet Checklist

This checklist highlights the high-level tasks for installing and cabling the cabinet to
physically connect and access the Definity One or Avaya IP600 system.
Installation Tasks
‰ For IP600, verify that all site requirements are
met.
‰ Confirm that customer's order includes all
equipment needed.
‰ Correct shipping errors.
Return defective and over-shipped
~
equipment.
Returned: ___________
Date: ______________
~
Direct short-shipped reports to nearest
MSL.
Report #:___________
Sent to: ___________
‰ Unpack and inspect equipment using lifting
precautions.
‰ For IP600, determine which equipment is
required and which is optional.
December 2001
For More Information
See
''Site Requirements'' on
page
1-3.
For IP600 see
''Check
customer's order'' on page 1-4
For Definity One see
''Check
customer's order'' on page
1-51.
For IP600 see
''Correct
shipping errors'' on page 1-4
For Definity One see
''Correct
shipping errors'' on page
For IP600 see
''Unpack and
inspect'' on page 1-5
For Definity One see
''Unpack
and inspect'' on page
1-51.
See
''Comcodes for equipment
used with Avaya IP600'' on
page
1-8.
Issue 6
v
1-51.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip600

Table of Contents