Installation and Upgrades for DEFINITY ONE and
IP600 Internet Protocol Release 10 555-233-109
Checklists
Checklists for Installation Technicians
Installation Tasks
Install equipment room hardware for Avaya
IP600 or DEFINITY ONE.
Cross-connect the cabinet to the patch
~
panels for IP600 or the MDF for Definity
One.
Identify the allowable circuit packs.
~
Install the circuit packs.
~
Make sure that off premises circuits have
~
protection from hazardous voltages and
currents.
~
Install sneak fuse panels.
~
For Definity One, label the MDF.
Set ringing option.
Install and wire telephones and other
equipment.
Install attendant console. (optional)
~
Install 26B1 Console. (optional)
~
Connect external alarms and auxiliary
connections.
Install the BRI terminating resistor.
Use multi-point adapters to provide signal
fanout of the T-interface.
Wire the off-premises stations with the cabling
provided by the local telephone company.
Install the emergency transfer panel (or
equivalent) and associated analog telephones
to provide emergency transfer capabilities.
Connect modem.
December 2001
For More Information
See:
DEFINITY Communications
System Generic 1 and Generic
3 Main Distribution Field
Design (555-230-630),
''Install equipment room
hardware for Avaya IP600'' on
page 1-37
or
''Install equipment room
hardware for DEFINITY
ONE'' on page
1-80.
See
''Set ringing option for
Avaya IP600'' on page 1-49
or
''Set ringing option for
DEFINITY ONE'' on page
1-95.
See
''Install and wire
telephones and other
equipment'' on page
1-97.
See
''Connect external alarms
and auxiliary connections'' on
page
1-110.
See
''Install the BRI
terminating resistor'' on page
1-113.
See
''Install multi-point
adapters'' on page
1-117.
See
''Install off-premises
station wiring'' on page
See
''Install emergency
transfer panel and associated
telephones'' on page
1-125.
See
''Connect modem to
telephone network'' on page
1-133
and
''Connect modem''
on page
1-134.
Issue 6
vii
1-120.