Wacker Neuson Telehandler TH412 Operator's Manual page 323

Table of Contents

Advertisement

Wheel change
For the tightening torques
tightening torques" on page
Preparations:
1. Park the machine on firm, level and dry ground.
2. Apply the parking brake.
3. Fully lower the loading frame to the ground.
4. Stop the engine.
BA TH412 * 06/2017 * 4512_7-18_Reifen_en.fm
– see chapter 9 " Specific
9-8.
Way of proceeding:
1. Position the jack underneath the axle, next to the
wheel to be changed.
- Ensure that the machine cannot slip off the jack.
➥ Secure the machine with additional supports if
necessary.
2. Loosen the wheel bolts.
3. Raise the jack until the wheel is barely off the ground.
4. Unscrew the wheel bolts.
➥ The wheel can be removed.
5. Position a new wheel.
➥ Tighten the wheel bolts hand-tight.
6. Lower the jack.
7. Tighten the wheel bolts alternately on the opposite
sides to the prescribed torque.
- After a wheel change, re-tighten the wheel bolts after
2 operating hours.
➥ If necessary, repeat until the tightening torque
remains constant.
Maintenance 7
7-69

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Telehandler TH412 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF