5 Operation
Break times and lubrication times are set with the notched
switches (S and P) in the window of the controls.
•
To set the time, remove the red frame
motor protective housing of the pump with a flat screw-
driver.
•
Loosen the four cross-slotted screws.
➥ Remove the cover.
•
Set the break time P and lubrication time S with a flat
screwdriver.
Install the cover once setting is over.
Setting lubrication times (S)
➥ 1 to 16 minutes (16 notches, 1 minute each)
Setting break times (P)
➥ 0.5 to 8 h (16 notches, 0.5 h each)
5-108
LED (L)
The LEDs signal various operating states of the central
(Fig.
125) on the
lubrication system.
When switching on the ignition:
•
Both LEDs light up for 1.5 seconds for a self-test.
During the entire lubrication process:
•
The red LED does not light up.
•
The green LED lights up continuously.
Should errors occur on the lubrication system:
•
The red LED flashes.
The green LED does not light up.
BA TH412 * 06/2017 * 4512_5-13_5_Opt_Sonst_en.fm
Need help?
Do you have a question about the Telehandler TH412 and is the answer not in the manual?
Questions and answers