4 Putting into operation
4.4
Preparations
Information about putting the vehicle into operation
•
Read and understand the Operator's Manual before
putting the machine into operation!
•
Operate the machine only from the operator seat!
•
Pay attention to all safety instructions.
•
Have qualified personnel instruct you before using the
machine for the first time. Perform test runs on open
terrain.
•
Check the condition of the machine before starting
work.
•
Have the machine checked by qualified personnel
before putting it into operation again after it has been
out of operation over a longer period of time.
4-38
Putting into operation
Tips on how to achieve optimal output
•
Do not put a cold diesel engine under load
➥ Let the diesel engine warm up at low engine speed
(1/4 throttle) for about 30 seconds.
•
Avoid loading the diesel engine at idling speed.
➥ Avoid low-load operation (less than 20% load).
•
Do not run the diesel engine at high speed for
extended periods.
•
Strictly observe maintenance intervals and perform (or
have performed) the mandatory maintenance.
BA TH412 * 06/2017 * 4512_4-4_Vorbereitung_en.fm
Need help?
Do you have a question about the Telehandler TH412 and is the answer not in the manual?
Questions and answers