Wacker Neuson Telehandler TH412 Operator's Manual page 156

Table of Contents

Advertisement

5 Operation
Operating the telescopic boom
Fig. 64
5-30
34
35
The telescopic boom is operated with the buttons 34 and
35 in the Mast control lever 4.
Press the button 34.
➥ The telescopic boom is extended.
Press the button 35.
➥ The telescopic boom is retracted.
NOTICE
Risk of technical damage.
Risk of bending the hydraulic cylinder that extends and
retracts the telescopic boom. Avoid damage to the
telescopic boom.
► Only perform leveling and digging work with the
telescopic boom fully retracted.
BA TH412 * 06/2017 * 4512_5-9_Arbeitshydraulik_en.fm

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Telehandler TH412 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF