Wacker Neuson Telehandler TH412 Operator's Manual page 179

Table of Contents

Advertisement

Coupling hydraulic connections
6
Fig. 80
BA TH412 * 06/2017 * 4512_5-10_Anbaugeraete_en.fm
Preparations
The pressure on the hydraulic connections has to be
released before they can be coupled.
1. Retract the telescopic boom completely.
2. Lower the attachment until it is barely above the
ground.
3. Stop the engine.
4. Move the control lever 6 back and forth several times.
➥ The pressure on the hydraulic connections on the
loader unit is released.
5. Remove the protective caps from the loader unit
connections.
- To do this, press the connections forward together
with the hydraulic hose.
6. Remove the protective caps from the hydraulic
connections of the attachment.
Operation 5
5-53

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Telehandler TH412 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF