5 Operation
Operation
E/S
A/S
S
A
E
A/H
E/H
H
4
Fig. 83
5-60
When tilting out the lightweight material/earth bucket and
when loading vehicles, two work movements can be
performed at the same time if required, for example
"Raising" and "Tilting out" or "Lowering" and "Tilting in". To
do this, the movements must be superimposed on the
control lever 4.
H = raise
S = lower
E = tilt in
A = tilt out
Information
Practice using the lightweight material/earth bucket before
working with it for the first time.