Wacker Neuson Telehandler TH412 Operator's Manual page 235

Table of Contents

Advertisement

Engine oil and hydraulic oil preheating
WARNING
Risk of electric shock
The mains plug is operated with 230 volts.
► Run the engine and hydraulic oil preheating only in a
dry place.
The machine can be fitted with an engine and hydraulic oil
preheating. It preheats the coolant/hydraulic oil. The
following operating times are recommended depending
on outside temperatures:
BA TH412 * 06/2017 * 4512_5-13_5_Opt_Sonst_en.fm
Temperature (°C/°F)
Operating time in hours (h)
−20 °C/−4 °F
3 h
-10 °C/14 °F
2 h
-5 °C/23 °F
1.5 h
0 °C/32 °F
1 h
+10°C/50 °F
1 h
Operation 5
5-109

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Telehandler TH412 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF