Wacker Neuson Telehandler TH412 Operator's Manual page 250

Table of Contents

Advertisement

6 Transportation
Crane-lifting the machine
Safety instructions regarding crane-lifting
In order to avoid injury or accidents, observe the following
instructions when loading the machine!
Seal off the danger zone.
The crane and the lifting gear must have suitable
dimensions.
Take into account the machine's overall weight.
Use only tested ropes, belts, hooks, shackles (screw
and socket pins with lockable brackets) for fastening
the machine.
Have loads fastened and crane operators only guided
by experienced persons.
The person guiding the crane operator must be within
sight or sound of him.
The crane operator must observe all movements of the
load and the lifting gear. Secure the vehicle against
unintentional movement.
The crane operator may move a load only after making
sure that the load is safely fastened and nobody is
within the danger zone, or after receiving a signal from
the persons attaching or securing loads.
The load must not be fastened by winding the lifting
rope or chain around it.
6-8
Bear in mind the load distribution (center of gravity)
when fastening the lifting gear.
Load the machine only with an empty attachment in
transport position.
Ensure that no one is in or on the machine.
Stay clear of a raised load.
Pay attention under all circumstances to the safety
instructions
Crane-lifting on page 2-16
mation in the "Earth moving machinery" leaflet of the
German Employers' Liability Insurance Association for
construction engineering.
BA TH412 * 06/2017 * 4512_6-2_Verladen_en.fm
and to the infor-

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Telehandler TH412 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF