Wacker Neuson Telehandler TH412 Operator's Manual page 236

Table of Contents

Advertisement

5 Operation
NOTICE
Damage to engine preheating due to misuse!
► Use only the preheating for cold starts for the duration
of the operating times specified above (overheating
protection)!
► Check the coolant and hydraulic oil level every time
before using the preheating, otherwise the heating
cartridge can burn out!
► Check for leaks, including on a warm machine.
► The coolant must always have a sufficient amount of
antifreeze.
► Check cables regularly for damage or aging.
Immediately replace a damaged cable.
5-110
Requirements for connecting the engine/hydraulic
oil preheating:
230 V mains supply
Maximum 16 ampere fuse protection
Residual current circuit breaker (FI switch)
Power outlet with grounding contact
The machine body and the protective conductor of the
power outlet must be conductively connected together
under all circumstances.
BA TH412 * 06/2017 * 4512_5-13_5_Opt_Sonst_en.fm

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Telehandler TH412 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF