Heating Control - I-Component (Min.); Heating Control - Extended Settings - ABB ClimaECO SBS/Ux.0.1 Series Product Manual

Table of Contents

Advertisement

11.4.11 Heating control - I-component (min.)

Options:
The I-component refers to the readjust time of a control. The integral component has the effect
of moving the room temperature slowly toward, and ultimately reaching, the setpoint value.
Depending on the type of system used, the readjust time has to have different values. In
general, the more inactive the overall system, the greater the readjust time.
Notice - Readjust time
Notice
This parameter is only available when "Control value type" parameter is set
either on "PI continuous, 0 – 100%,"PI PWM, On/Off" or "Fan coil". In addition,
the "Heating type" parameter must be set on "Free configuration".

11.4.12 Heating control - Extended settings

Options:
No:
No additional parameters are enabled.
Yes:
Additional parameters are enabled.
This parameter enables the following additional functions and communication objects in
dependence of parameter "Control value type":
"Basic stage heating"
"Settings of basic load"
Product manual 2CKA001473B9679
Description of application and parameters
Setting option from 0 to 255
If the I-component "Readjust time" selected too small (fast), the system
tends to overshoot at the start.
If the I-component "Readjust time" is selected too large, the system
responds constantly too slow.
No
Yes
Application "RTC"
│95

Advertisement

Table of Contents
loading

Table of Contents