Using an Existing Pad

In many applications, SlideSmart may be a replacement
operator for an existing gate system.
Make sure the pad is level and inspect the pad for:
Compliance with local building codes.
Appropriate distance from the gate. See Figure 1-4.
Appropriate dimensions (See Figure 1-2) for
SlideSmart installation.
Durability.
To use an existing pad, take the following steps:
1. Remove any existing equipment from the pad.
2. Measure the pad to ensure it is sized properly for
SlideSmart.
3. Check the mounting hole locations and re-drill, if
necessary.
4. Follow the steps in
CAUTION
Consider positioning the operator so existing conduit enters the cutout in the SlideSmart base
plate. Cutting small holes in the plastic base plate and cover for pre-existing conduit is
permissible. Two 0.875-inch (22mm) diameter holes for running conduit are also provided on
both sides of the chassis. See Figure 1-5.
Revision D
Concrete Pad
Mount.
Installation
Site Overview & Planning
Chain to Gate
3¾" (9.5cm)
Ideal distance =
Minimum distance = 2½" (6.4cm)
Cut out
if rear
Chain
install
height
¾"
7
(19.7cm)
Concrete pad
Side View
Figure 1-4.
Conduit cut outs
Figure 1-5.
Gate
Grade
level
1-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slidesmart dc 10fSlidesmart dcs 10f (solar)Slidesmart dcSlidesmart dcs10fSlidesmart dcs15

Table of Contents