Installation; Installation And Removal For Din Rail - Panasonic FP-XH M8N16PD User Manual

Programmable controller
Table of Contents

Advertisement

4.6 Installation

4.6.1 Installation and Removal for DIN Rail

 Installation steps
PROCEDURE
1. Pull out all DIN rail mounting stems on the back of the unit from underside.
2. Embed the upper part of the unit installing part into the DIN rail.
3. Embed the lower part of the unit installing part into the DIN rail while
pushing the unit installing part into the DIN rail.
4. Push up the DIN rail mounting stem on the back of the unit and lock until
you hear a "click" sound.
 Removal steps
PROCEDURE
1. Pull out all DIN rail mounting stems on the back of the unit from underside.
2. Pull the lower side of the unit toward you.
3. Remove it from the DIN rail while lifting the unit.
4.6 Installation
4-11

Advertisement

Table of Contents
loading

Table of Contents