8.5.2 Change Sequence of PBs

The execution sequence of PBs can be altered freely after compiling the PBs. Explain it as
below assuming that the 3 PBs has been compiled.
PROCEDURE
1. Double-click "Change execution order" from the project tree.
The "Change PB Execution Order" dialog box is displayed.
2. Select the PB for which the execution sequence is to be changed, click the
[Up] or [Down] button.
3. Click the [Yes] button.
The name of the PB is displayed on the project tree according to the changed
execution.