3
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Station number setting
Set the IO-Link module station number.
Page 29 Setting station number setting switches
2.
Function setting switch setting
Set the function setting switch.
Page 30 Function setting switch setting
3.
Connection
Mount the IO-Link module on the DIN rail.
Page 33 Mounting the modules on a DIN rail
4.
Wiring
Wire a power supply, an Ethernet cable, and an external device to the IO-Link module.
Page 35 Wiring with terminal block for module power supply and FG
Page 37 Wiring of Ethernet cable
Page 39 Wiring of IO-Link terminal block and external devices
5.
Power-on
Power on the IO-Link module.
6.
Parameter setting and programming
Set parameters and create a program.
Page 43 PARAMETER SETTING
Page 105 PROGRAMMING
To replace the IO-Link module, follow the procedure described below.
• Power off the IO-Link module and remove it.
• Prepare a new IO-Link module and perform the above procedure. (The network parameters of the CC-Link
IE Field Network master station do not need to be set again.)
• After checking the operation, restart the control.
3 PROCEDURES BEFORE OPERATION