3
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Station number setting
Set the IO-Link module station number.
Page 29 Setting station number setting switches
2.
Function setting switch setting
Set the function setting switch.
Page 30 Function setting switch setting
3.
Connection
Mount the IO-Link module on the DIN rail.
Page 33 Mounting the modules on a DIN rail
4.
Wiring
Wire a power supply, an Ethernet cable, and an external device to the IO-Link module.
Page 35 Wiring with terminal block for module power supply and FG
Page 37 Wiring of Ethernet cable
Page 39 Wiring of IO-Link terminal block and external devices
5.
Power-on
Power on the IO-Link module.
6.
Parameter setting and programming
Set parameters and create a program.
Page 43 PARAMETER SETTING
Page 105 PROGRAMMING
To replace the IO-Link module, follow the procedure described below.
• Power off the IO-Link module and remove it.
• Prepare a new IO-Link module and perform the above procedure. (The network parameters of the CC-Link
IE Field Network master station do not need to be set again.)
• After checking the operation, restart the control.
3 PROCEDURES BEFORE OPERATION
22