Download  Print this page

Appendix 4 Io-link Device Replacement Procedure; When The Io-link Module Is Replaced While The Module Is Powered Off - Mitsubishi Electric NZ2GF2S-60IOLD8 User Manual

Cc-link ie field network remote io-link module.
Hide thumbs

Advertisement

Appendix 4
When the IO-Link module is replaced while the module is
powered off
The following shows the procedure for replacing an IO-Link device with another IO-Link device in a state that the IO-Link
module power supply is off.
The replacement procedure may differ depending on conditions. ( Page 188 Condition)
Replacement procedure
 Set "Device Validation Setting" to "0: Do not validate".
Page 70 IO-Link device validation function
 Power off the IO-Link module.
 Remove the connected IO-Link device, and replace it with a new IO-Link device.
Page 39 Wiring of IO-Link terminal block and external devices
 Create or change a program. Skip this step if not creating programs or making changes.
Page 105 PROGRAMMING
 Power on the IO-Link module.
 Configure the parameter setting of the IO-Link device.
Page 54 IO-Link Device Parameter Setting
 Check the event history for errors and confirm that events are being stored as intended.
Page 132 Method for Checking the Event History
 Return "Device Validation Setting" back to the original setting.
 Restart the control.
Condition
Device validation
New IO-Link
setting
device
Not validate
Compatible
Incompatible
Compatibility validation
Compatible
Incompatible
APPX

Appendix 4 IO-Link Device Replacement Procedure

IO-Link Device Replacement Procedure
IO-Link device parameter used after
replacement
When IO-Link device parameters are downloaded from the
non-volatile memory of the IO-Link module
When IO-Link device parameters are uploaded from the
new IO-Link device
When IO-Link device parameters are newly set
When IO-Link device parameters are downloaded from the
non-volatile memory of the IO-Link module
When IO-Link device parameters are uploaded from the
new IO-Link device
When IO-Link device parameters are newly set
When IO-Link device parameters are downloaded from the
non-volatile memory of the IO-Link module
When IO-Link device parameters are uploaded from the
new IO-Link device
When IO-Link device parameters are newly set
When IO-Link device parameters are downloaded from the
non-volatile memory of the IO-Link module
When IO-Link device parameters are uploaded from the
new IO-Link device
When IO-Link device parameters are newly set
Replacement procedure
Set "Device Validation Setting" to "1.
Compatibility Validation (vendor information and
model name)".



Cannot be used.





Cannot be used.

Perform all procedures.

Advertisement

Table of Contents

   Related Manuals for Mitsubishi Electric NZ2GF2S-60IOLD8

Comments to this Manuals

Symbols: 0
Latest comments: