Install the Midplane Assembly
e.
Install the four power supplies PS0-3.
See
12.
Replace components at the back of the server:
a.
Install both SMODs.
See
b.
Install all eight DPCCs.
See
For slot designations, see
c.
Attach cables to their respective connectors and ports at back side of the
server.
13.
Prepare the server for operation.
See
"Returning the Server to Operation" on page
14.
Update the TLI FRUPROM data containers.
Oracle service personnel needs to manually reprogram the FRU containers into FRUPROM0
and FRUPROM1.
244
Oracle Server X7-8 Service Manual • April 2018
"Install a Power Supply" on page
"Install an SMOD" on page
"Install a DPCC" on page
"Replaceable Components" on page
144.
201.
157.
245.
22.