Oracle X7-8 Service Manual page 143

Hide thumbs Also See for X7-8:
Table of Contents

Advertisement

Call
Status LED or Button
Out
4
Ejector lever
To access the FIM release latch, remove the top power supply (PS3).
Note -
3.
To unlock the power supply lever, squeeze together the two green release
latches at the end of the lever (1).
This action is accompanied by a click sound.
To disengage the power supply from its internal connector, rotate the lever to the
4.
left (2).
Pinch point. When operating the lever, keep your fingers clear of the hinged end of
Caution -
the lever.
The pawl at the hinged end of the lever engages the sidewall of the server and provides the
pivot point for leverage to disengage the power supply. This action leaves the power supply
extending partially from its slot.
Icon and
Description
Color
■ Steady On – PS is connected to a properly rated
AC power source.
None
Used to release the power supply from the chassis
Remove a Power Supply
Servicing Components
143

Advertisement

Table of Contents
loading

Table of Contents