9.
To secure the cover to the chassis, tighten the 19 captive screws.
10.
Install the server chassis in the rack.
Refer to
"Installing the Server Into a Rack" in Oracle Server X7-8 Installation
Replace components at the front of the server:
11.
a.
Install the CMODs.
See
"Install a CMOD" on page
Your server might have four CMODs, or it might have eight.
Install both fan frames.
b.
See
"Install a Fan Frame" on page
c.
Install all eight fan modules FM0-7.
See
"Install a Fan Module" on page
d.
Install the FIM.
See
"Install the FIM" on page
167.
137.
133.
228.
Install the Midplane Assembly
Guide.
Servicing Components
243