Oracle X7-8 Service Manual page 214

Hide thumbs Also See for X7-8:
Table of Contents

Advertisement

Replace the ESM Extension Cable
4.
Disconnect the Energy Storage Module (ESM) cable from the ESM extension
cable [1].
5.
DIsconnect the ESM extension cable from the HBA [2].
6.
Disconnect the ESM extension cable from the clip on the enclosure wall [3].
Open the clip [A].
Slide the cable out of the guide [B].
7.
Remove the old ESM extension cable.
8.
Route the new ESM extension cable from the HBA, through the clip on the side
wall, and through the cable guide.
Connect the ESM extension cable to the connector on the ESM [1].
9.
214
Oracle Server X7-8 Service Manual • April 2018