Omron FH-1 series User Manual page 281

Vision sensor fh series; fz5 series
Hide thumbs Also See for FH-1 series:
Table of Contents

Advertisement

Item
Measurement initialization priority
Measurement priority
Relocate memories
IMPORTANT
*1 For FH series/FZ5-1100 series, [Relocate memories] setting is invalid.
*2 Relocate processing could be take time depends on relocated data capacity or data fragmentation when
[Relocate] is selected.
*3 An error could be occurred, e.g data is insufficient because data relocate processing is not carried out when
[Relocate] is selected. For data memory region, refer to
(p.359).
Vision System FH/FZ5 Series
User's Manual (Z365)
Set value
[Factory default]
Measurement initialization is performed immediately after
changing the scene or editing the flow. You can specify
whether measurement trigger reception or display refresh
processing has priority during measurement initialization.
Measurement trigger reception is given priority even during
[Measurement
measurement initialization processing. Displays for display
trigger receipt
refresh processing may be incomplete because of its
priority]
lowered priority status.
Processing of re-
Processing of refreshing the display is given priority.
drawing on screen
Measurement triggers will not be received until display
priority
refresh processing is completed.
Specify whether the processing priority is Measurement, or
Communication.
[Run the
Measurement processing is the highest priority.
measurement process
This setting is normally recommended.
as the top priority]
Communication processing is higher priority.
Communication is given higher priority even if
Lower the priority of
measurement processing runs with high-load. Therefore,
the measurement
measurement processing time will be longer.
process.
This setting is beneficial when a missed data is occurred
due to no handshake communication on EtherNet/IP.
Select the relocate processing.
Relocate processing is executed.
More units can be registered to one Scene group because
this function improves the memory efficiency.
• At startup.
• When the Scene group is selected.
[Relocate]
• When the Processing Unit is added.
• When Scene or Processing Unit is copied.
• When the data is changed. e.g. Model Region, Model
Re-region, Register is changed.
Relocate setting is normally recommended.
Relocate processing is not carried out.
Do not relocate
Set this setting when Relocate processing takes long time.
About Memories Usable with FH series/FZ5 series
Setting the Operating Environment of the System
Description
(*1)
6
279

Advertisement

Table of Contents
loading

Table of Contents