Remove The Server From The Rack - HPE ProLiant ML350 Gen10 User Manual

Hide thumbs Also See for ProLiant ML350 Gen10:
Table of Contents

Advertisement

4. If the rear panel cables were disconnected because a cable management arm is not in use, do the
following:
a. Connect each power cord to the server.
b. Connect all peripheral cables to the server.
c. Power up the server on page 38.

Remove the server from the rack

WARNING:
This server is heavy. To reduce the risk of personal injury or damage to the equipment:
Observe local occupational health and safety requirements and guidelines for manual material
handling.
Get help to lift and stabilize the product during installation or removal, especially when the product is
not fastened to the rails. Hewlett Packard Enterprise recommends that a minimum of two people are
required for all rack server installations. A third person may be required to help align the server if the
server is installed higher than chest level.
Use caution when installing the server in or removing the server from the rack; it is unstable when
not fastened to the rails.
Prerequisites
Before you perform this procedure, make sure that you have T-15 Torx screwdriver available.
Procedure
1. Power down the server on page 38.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripherals cables from the server.
4. Slide the server tray out of the rack:
a. Loosen the server tray thumbscrews.
b. Grasp the tray notch to slide the server out of the rack.
Remove the server from the rack
45

Advertisement

Table of Contents
loading

Table of Contents