HPE ProLiant ML350 Gen10 User Manual page 76

Hide thumbs Also See for ProLiant ML350 Gen10:
Table of Contents

Advertisement

6.
Attach the ground (earthed) wire to the ground screw and washer and tighten to 1.47 N m (13 lb-in) of
torque. The ground wire must be connected before the -48 V wire and the return wire.
The ground wire must be connected before the -48 V wire and the return wire.
7.
Insert the -48 V wire into the left side of the terminal block connector, and then tighten the screw to
1.3 N m (10 lb-in) of torque.
76
Hardware options installation

Advertisement

Table of Contents
loading

Table of Contents