Installing The 8 Sff Hot-Plug Drive Cage - HPE ProLiant ML350 Gen10 User Manual

Hide thumbs Also See for ProLiant ML350 Gen10:
Table of Contents

Advertisement

Kit contents
8 SFF hot-plug drive cage
SFF drive blanks (8, preinstalled in the drive cage)
Drive power cable
T-15 Torx screws (4)

Installing the 8 SFF hot-plug drive cage

Prerequisites
Before you perform this procedure, make sure that you have the following items available:
Drive cage option kit
Storage controller cable option
SFF hot-plug drive option
T-15 Torx screwdriver
Procedure
1.
Remove the front bezel on page 39.
2.
Power down the server on page 38.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Do one of the following:
Server in tower mode: Position the tower server for hardware configuration on page 41.
Server in rack mode: Extend the server from the rack on page 43.
6.
Remove the access panel on page 48.
7.
Remove the air baffle on page 50.
8.
If installed, remove the fan cage.
9.
Do one of the following:
If the drive cage is to be installed in box 1, remove the media bay blanks.
Retain the blanks for future use.
If the drive cage is to be installed in box 2 or 3, remove the drive cage blank.
94
Installing the 8 SFF hot-plug drive cage

Advertisement

Table of Contents
loading

Table of Contents