Electrostatic discharge

Be aware of the precautions you must follow when setting up the system or handling components. A
discharge of static electricity from a finger or other conductor may damage system boards or other static-
sensitive devices. This type of damage may reduce the life expectancy of the system or component.
To prevent electrostatic damage:
Avoid hand contact by transporting and storing products in static-safe containers.
Keep electrostatic-sensitive parts in their containers until they arrive at static-free workstations.
Place parts on a grounded surface before removing them from their containers.
Avoid touching pins, leads, or circuitry.
Always be properly grounded when touching a static-sensitive component or assembly. Use one or more
of the following methods when handling or installing electrostatic-sensitive parts:
Use a wrist strap connected by a ground cord to a grounded workstation or computer chassis. Wrist
straps are flexible straps with a minimum of 1 megohm ±10 percent resistance in the ground cords. To
provide proper ground, wear the strap snug against the skin.
Use heel straps, toe straps, or boot straps at standing workstations. Wear the straps on both feet when
standing on conductive floors or dissipating floor mats.
Use conductive field service tools.
Use a portable field service kit with a folding static-dissipating work mat.
If you do not have any of the suggested equipment for proper grounding, have an authorized reseller
install the part.
For more information on static electricity or assistance with product installation, contact an authorized reseller.

Prerequisites for the initial server setup

Procedure
Verify that the optimum environmental requirements are satisfied.
Confirm that the installation engineer understands how to integrate the server into the user network, in
particular from an IP addressing perspective and from a domain perspective.
Prepare Ethernet cables of an appropriate length for each of the LAN, WAN, and remote management
(iLO) connections.
Verify that there are sufficient ports available on the devices to which the server will be connected (for
example, router, LAN switch).

Server box contents

The server shipping box contains the following items:
Server
Chassis feet (4)
Power cord
Documentation

Setting up the server in tower mode

Procedure
1. Rotate the chassis feet outward to stabilize the server.