Lff Hot-Plug Drive Cage Option; Installing The 4 Lff Hot-Plug Drive Cage - HPE ProLiant ML350 Gen10 User Manual

Hide thumbs Also See for ProLiant ML350 Gen10:
Table of Contents

Advertisement

Server in tower mode: Position the tower server for operation on page 42.
Server in rack mode: Slide the server into the rack on page 47.
18. Connect all peripheral cables to the server.
19. Connect each power cord to the server.
20. Connect each power cord to the power source.
21. Power up the server on page 38.
22. Install the front bezel on page 40.
The installation is complete.

4 LFF hot-plug drive cage option

The server supports the 4 LFF drive cage option. This option:
Can be installed in boxes 1–3
Cannot be installed together with the 8 SFF hot-plug drive cage option
Supports SATA or SAS drives depending on the storage controller used
Kit contents
4 LFF hot-plug drive cage
LFF drive blanks (4, preinstalled in the drive cage)
Drive power cable
T-15 Torx screws (4)

Installing the 4 LFF hot-plug drive cage

Prerequisites
Before you perform this procedure, make sure that you have the following items available:
Drive cage option kit
Storage controller cable option
LFF hot-plug drive option
T-15 Torx screwdriver
Procedure
1.
Remove the front bezel on page 39.
2.
Power down the server on page 38.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Do one of the following:
Server in tower mode: Position the tower server for hardware configuration on page 41.
Server in rack mode: Extend the server from the rack on page 43.
6.
Remove the access panel on page 48.
7.
Remove the air baffle on page 50.
8.
If installed, remove the fan cage.
4 LFF hot-plug drive cage option
91

Advertisement

Table of Contents
loading

Table of Contents