HPE ProLiant ML350 Gen10 User Manual page 141

Hide thumbs Also See for ProLiant ML350 Gen10:
Table of Contents

Advertisement

3. Install the TPM cover:
a. Line up the tabs on the cover with the openings on either side of the TPM connector.
b. To snap the cover into place, firmly press straight down on the middle of the cover.
4. Proceed to Preparing the server for operation on page 141.
Preparing the server for operation
Procedure
1. Install any options or cables previously removed to access the TPM connector.
2. Install the air baffle on page 51.
3. Install the access panel on page 49.
4. Do one of the following:
Server in tower mode: Position the tower server for operation on page 42.
Server in rack mode: Slide the server into the rack on page 47.
5. Connect each power cord to the server.
6. Connect each power cord to the power source.
Hardware options installation
141

Advertisement

Table of Contents
loading

Table of Contents