HPE ProLiant ML350 Gen10 User Manual page 122

Hide thumbs Also See for ProLiant ML350 Gen10:
Table of Contents

Advertisement

Server in tower mode: Position the tower server for hardware configuration on page 41.
Server in rack mode: Extend the server from the rack on page 43.
6.
Remove the access panel on page 48.
7.
Remove the air baffle on page 50.
8.
While holding the snap-in latch in the open position, slide the holder up to disengage it from the chassis.
9.
Install the Smart Storage Battery into the holder:
a. Route the battery cable through the holder cutout marked with a down arrow.
b. Install the battery in the holder.
10. Secure the battery cable through the holder cable clips.
122
Hardware options installation

Advertisement

Table of Contents
loading

Table of Contents