Drilling plan

The communication server is suspended into two premounted wall screws using the
suspension points in the housing base. Depending on the type of mounting, these are
the suspension points marked under position A or B on the drilling plan. The communi-
cation server is secured with a third screw to prevent it from being dislodged acciden-
tally (position C).
All dimensions in mm
Fig. 14
Drilling plan for Mitel 415/430 wall mounting
86
Mitel 415/430 as of R4.1
syd-0580/1.2 – R4.1 – 08.2016