Bank Setting Level

5-5

Bank Setting Level

Power ON
Operation Level
PID Setting
Level
The bank setting level is used to make settings such as the SP, PID set, alarm
value, soak time, and wait band for each bank. Move to a particular bank from
the Display Bank Selection parameter, which is displayed first in the bank
selection level.
Adjustment
Level
Press the O Key
for at least 1 s.
Bank Setting
Level
Temperature control
being performed.
Bank Setting Level
Display Bank Selection
d.bnk
Bank0
0
d.bnk
Bank1
1
d.bnk
d.bnk
2
2
Bank2
d.bnk
7
Bank7
M
M
c
0.lsp
c
0.a
2h
0.0
7.lsp
c
Bank 7 SP
M
0.0
0.0
M
M
0.pid
1
c
0.a
2l
7.pid
Bank 7 PID
M
0.0
Set No.
1
M
M
0.spr
Bank 7
off
c
0.a
-3
7.spr
SP Ramp
M
0.0
off
Set Value
M
M
c
0.a
-1
c
0.0
0.a
3h
c
7.a
-1
Bank 7
0.0
M
Alarm Value 1
0.0
M
0.a
c
1h
M
Bank 7
c
0.a
3l
0.0
7.a
c
1h
Alarm Value
M
0.0
0.0
Upper Limit 1
M
0.a
M
c
1l
Bank 7
0.0
0.sok
c
7.a
1l
Alarm Value
M
1
0.0
Lower Limit 1
M
c
0.a
-2
M
0.wtb
0.0
Bank 7
7.a
-2
c
off
M
Alarm Value 2
0.0
M
M
Section 5-5
Bank 7
7.a
2h
c
Alarm Value
0.0
Upper Limit 2
Bank 7
c
7.a
2l
Alarm Value
0.0
Lower Limit 2
M
c
7.a
-3
Bank 7
Alarm Value 3
0.0
M
Bank 7
7.a
3h
c
Alarm Value
0.0
Upper Limit 3
M
Bank 7
7.a
3l
Alarm Value
0.0
Lower Limit 3
M
Bank 7
7.sok
Soak Time
1
M
7.wtb
Bank 7
off
Wait Band
M
209

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E5cn-hE5en-h

Table of Contents