Omron E5AN-H User Manual page 251

Digital controllers
Hide thumbs Also See for E5AN-H:
Table of Contents

Advertisement

Initial Setting Level
pbnk
Valid Program Bank
Function
Setting
See
See
cp
Control Period (Heating)
c-cp
Control Period (Cooling)
Function
Setting
See
See
230
• This parameter sets the final bank number for executing program opera-
tion.
Setting range
0 to 7
■ Related Parameters
Program pattern (initial setting level): Page 229
• These parameters set the output periods. Set the control periods taking
the control characteristics and the electrical durability of the relay into
consideration.
• For standard control, use the Control Period (Heating) parameter. The
Control Period (Cooling) parameter cannot be used.
• When the heating control output is a current output, the Control Period
(Heating) parameter cannot be used.
• For heating/cooling control, the control period can be set independently
for heating and cooling. The Control Period (Heating) parameter is used
for the heating control output, and the Control Period (Cooling) parameter
is used for the cooling control output
Parameter name
Control Period (Heating)
Control Period (Cooling)
■ Related Parameters
PID ON/OFF (initial setting level): Page 228
The Program Pattern parameter
must not be set to OFF.
Default
7
The cooling control output and heat-
ing control outputs must be assigned
to relay outputs, voltage outputs (for
driving SSR), or SSR outputs.
The control must be set to 2-PID
control.
For the Control Period (Cooling)
parameter, the control must be set to
heating/cooling control.
Setting range
Unit
0.5 or 1 to 99
Second
0.5 or 1 to 99
Second
Section 5-9
Default
20