ASCOM Ascotel 2025 System Manual page 667

Isdn telecommunications system
Table of Contents

Advertisement

ascom
Ascotel 2025/2045/2065
System Installation
Once determined, the locations must be observed precisely in order to obtain
reproducible results. There are always surprising effects in practice, due for exam-
ple to cells being set up with several radio units (rather than the one cell originally
planned and surveyed). If for example masts are used as mounting structures and
fitted on both sides with radio units, conditions on either side of the mast will be
different.
For precise installation instructions, refer to Part 4.
Re-measuring the installed System
Before the system can be handed over to the customer, the measurements need
to be verified and compared with the values of the original measurement.
More detailed information on installation and re-measurement is described in
"Measuring Equipment", Page 3.59 and "Measurements", Page 3.82 as well as
in , "General Checks", Page 6.2.
Documentation
The system documentation is an essential requirement. This applies to both the
planning and the execution phases. To this end all the data is recorded and set
out in a final written version. Modifications and updates must also be docu-
mented.
This documentation can then be used as reference in the event of project exten-
sions, enquiries or other matters.
3.36
Planning DECT Systems
HBT_20321104_03/B0_en

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ascotel 2045Ascotel 2065

Table of Contents