Agilent Technologies AssayMAP Bravo Installation Manual page 22

Platform
Table of Contents

Advertisement

Installing the platform
Installing the 96AM Wash Station and Pump Module
Tubing connections for 96AM Wash Station
14
Figure 96AM Wash Station secured with platepad brackets
The following figure shows the AssayMAP Bravo tubing connections for the
96AM Wash Station. As the figure shows, the upper pump (A) is for the fill
line and the lower pump (B) is for the empty line.
Note: You specify which pump is for filling and which pump is for emptying in
Bravo Diagnostics.
Figure 96AM Wash Station fill line (A) and empty line (B)
Source
Waste
To ensure proper chimney filling and waste emptying characteristics for the
96AM Wash Station, ensure that you use the proper tubing combination for the
Pump Module. See the following figure and table.
A
B
AssayMAP Bravo Platform Installation Guide

Advertisement

Table of Contents
loading

Table of Contents