Agilent Technologies AssayMAP Bravo Installation Manual page 24

Platform
Table of Contents

Advertisement

Installing the platform
Installing the 96AM Wash Station and Pump Module
Routing the tubing
16
Refer to the preceding table and figure, and use the following procedure to
route the wash station tubing.
To route the tubing:
1
Prepare two 3- way (Y- connector) tubing assemblies and connect them to
the wash station, as follows:
a
Cut three 10.16- cm (4- inch) lengths of the 1/4- inch tubing, and place
one length on each of the three barbed ends of a 1/4- inch 3- way
connector (a).
b
Attach the two free ends of the prepared 3- way tubing assembly to the
wash station outlet ports, as the following figure (b) shows.
a
c
Repeat step a to create a second 3- way tubing assembly, and attach it
to the wash station inlet ports (c). Secure the tubes on the inlet ports
using tubing clamps.
2
For the top pump, prepare an approximately 20.32- to 25.4- cm (8- to
10- inch) length of 1/4- inch tubing, and insert quick- connect fittings on
both ends.
3
Place this tubing assembly within the top pump head, as follows:
00306
a
Lift up the flip- top cover on the pump head so that it is fully open.
b
c
AssayMAP Bravo Platform Installation Guide

Advertisement

Table of Contents
loading

Table of Contents